This well known family attraction required a number of entrance and exit solutions, with safety and security at the forefront of their planning.
Requirements
Warner Brothers Studios required a large amount of entrance/exit solutions around their facility in North West London.
Outcome
JLC supplied and installed 9 blast and one standard sliding door solutions across the site, including the largest blast enhanced sliding door ever installed (at a massive 8.4 metre wide opening). Following this success, JLC have taken on all of these entrance solutions as a service contract.